Skip to main content


Repost Message
will copy the article into draft mode and enable you to edit/change dates and information.
Do not change the dates
of this posting because it will affect the original.

MCC Daily Tribune

Pardon Our Dust-Sidewalk shutdown near building 7/1

Next week (8/5-8/9) there will be some excavation work occurring on the west side of building 7 which will require at least one, and possibly 2 sidewalks to be closed. Please exercise caution in this area and be aware you may need to take an alternate route.

Attached Files:
Excavation Drawing 7-31-19 for Trib.gif

Travis Sleight
Facilities
08/01/2019