On Friday, October 3rd, the second floor hallway of Building 1 will be closed from the Admissions Office (Room 1-211) to the bridge link corridor (spine). The contractors will close this from 6:30 M to 5:00 PM in order to complete construction work in this area.
Access to the Admission Office will be near the Building 6 elevator. To access the 3rd floor of Building 1, please use the stairways in Building 6 & 7, the Building 6 elevator, or the Building 1 (east) stairway which will be open from the 1st floor. Detour signs will be posted.
As always, thank you for your cooperation.
Kevin Walton Facilities - Engineering Services 10/01/2003 |