The MCC Swimming and Diving pools will be closed on Friday, August 13, 2004 for 4 weeks. During the shutdown period, the pools will be drained, acid washed and regrouted. If all work proceeds as planned, it is anticipated that usage will resume on Monday, September 13, 2004.
Dan Dubois Athletics 06/22/2004 |