Skip to main content


Repost Message
will copy the article into draft mode and enable you to edit/change dates and information.
Do not change the dates
of this posting because it will affect the original.

MCC Daily Tribune

Pardon Our Dust: Building 3 Sanitary Line Repair

Beginning Thursday, August 1, new grease traps will be installed in the Hospitality Labs (3-140 and 3-146A), and sanitary piping that runs below the student kitchens will be re-lined. Part of the work involves excavating a small section of flooring in Hallway 3-196F to replace a damaged fitting. The work area will be protected to minimize dust and ensure safe foot traffic through the hallway.

We appreciate your patience.  All work is expected to be complete by Friday, August 9.

If you have any questions, please email Quent Rhodes (qrhodes@monroecc.edu) or call 585-292-2804.

Quent Rhodes
Facilities
07/30/2024