Skip to main content

MCC Daily Tribune Archive

Where in the world is building 19?


The secret is out! Our newest classroom building has been built and numbered. It’s building 19 and it’s located on the east side of the Brighton campus just outside the Gilman Lounge. This single story building is handicapped accessible, contains that latest classroom technology, and has bright airy classrooms with all new furniture and more white boards than a New England church.

Like building 9A, each classroom has individual heating and cooling systems. Unlike 9A, building 19 has its own restroom facilities, smart boards, larger windows, more windows, and more sound absorption capability.  The location is central to campus located just west of parking lots N, M, and M1.

The new classrooms are over 800 square feet and nearly square in shape, allowing for more flexibility in teaching methods. The latest technology is available at the instructor’s station.



Blaine Grindle
Facilities Engineering
09/01/2010