The electrical contractor has informed us that the original timeframe of Saturday 6/2 from 6 a.m. to 7 a.m. is not enough. We are extending the power outage on campus 6/2 from 5 a.m. to 7 a.m. per his request. The chilled water outage will continue as planned.
Blaine Grindle Facilities Engineering 06/01/2012 |