MCC Daily Tribune
Building 4/5 Work - Pardon Our Dust
This Sunday 10/28 there will be a crane on site at the building 4 loading dock lifting an exhaust stack onto the side of building 5. Sidewalks in the area as well as the entrance to building 5 and offices on the north side of the building will be closed until the stack is properly secured to the building. We scheduled this work for a Sunday to try to minimize disruptions to the college but if there is any inconvenience caused we sincerely apologize. Any questions can be directed to me at x2808.
Travis Sleight
Facilities
10/26/2018